Project 1.


Project 1 is a building with 43,000 sqm Floor Area x 11.5m high. The Building is Operational between 109/119 hours a week The SIGMA III-4 High Efficiency Radiant Heating System provides comfort for workers at +19oC

Heating In The Storage Areas is maintained at +18oC
The Building is set back 49 to 59 hours a week to +13oC

Doorways are heated by a dedicated door-heating system to prevent cold air ingress as more than 120 Delivery Trucks a day enter & leave the Building creating diesel engine emissions

The BEST ventilation system changed the internal air 2.5/hour

The Old System Gas Consumption was 23.8m kW/hrs/season 

The New High Efficiency SIGMA lll/4 Heating Annual Gas Budget Guarantee Was 2.5m kW/hrs/season

The 2015 Season figures. Gas Consumed = 1.63m kW/hrs/season making the Energy Saving against the Old HV Warm Air System 93.35%

An additional 34.80% saving against the Globe Energy system guarantee.

Saving the Customer Gas & Power Worth £648,889.00p per year.

 

Project 2.


Project 2 is a system that was installed as building and Process Heating in a wheel and tyre assembly building in a ‘Just-In-Time’ operation.

The building is 11,000 sqm Floor Area x 15m high

The Building Is Operational 90 hours a week
The SIGMA III-4 High Efficiency Radiant Heating System provides comfort for employees at +19oC

The tyres need to be heated to +18oC as a minimum to keep them pliable for fitting, this is done by storing them in the building 

Doorways are heated by a dedicated door-heating system to prevent cold air ingress with Delivery Trucks entering & leaving Building collecting finished products and delivering tyres.

The BEST Heating & Ventilation systems maintain clean fresh heated air quality with which 3.5 complete air changes an hour. The New High Efficiency Heating Annual Gas Budget Guarantee

Was 2.5m kW/hrs/season

In Season 2014 the Gas Consumed = 1.88m kW/hrs/season The Energy Saving against the Old System 82.52%
And 24.84% Saving Against The New System Guarantee

 

Project 3.


Project 3 is a system that was installed to improve the building air quality and comfort in large motor truck manufacturing building which is 45,000 sqm Floor Area x 13m high. The Building Is Operational 120 hours a week

The Old Warm Air System consumed 25.01m kW/hrs Gas a season And Power 4.25m kW/hrs a season

The SIGMA III-4 High Efficiency Radiant Heating System provides comfort for welding and assembly workers at +19oC

Doorways are heated by dedicated door-heating Zones as part of the system.

The BEST Technology Heating & Ventilation systems maintain clean air quality with 3.5 complete air changes an hour.

The New High Efficiency Heating Annual Gas Budget Guarantee GAS - 5.44 m kW/hrs/season
POWER - kW/hrs/season

In Season 2013 the Gas Consumed = 1.95m kW/hrs/season And the Power was 0.12m kW/hrs/season
The Energy Saving against the Old System 92.21%
And 64.16% Saving Against The New System Guarantee 

Project 4.


Project 4 is a system that was installed to improve the building heating quality in large complex of aircraft hangars in Illinois USA.
The buildings could not be used in winter due to the previous boiler systems taking many days to recover comfort sufficient to work in after aircraft movements.

Hanger B734 is one of the buildings which is 4,400sqm Floor Area x 17.5m high

The Building is Operational only 40 hours a week set at +19oC

And is set back 128 hours a week at +13oC
Before the system was installed the hangars were not able to be used for service work 4 months of the year as aircraft movements in and out of the hangers made the buildings too cold to work in.

The Old System consumed 15.64m kW/hrs Gas a season

The SIGMA III-4 High Efficiency Radiant Heating System provides comfort for aircraft maintenance fitters with a guaranteed recovery after aircraft movements to +19oC air temperature in 15 minutes.

The New Heating Annual Gas Guarantee 2.5m kW/hrs/season

In Season 2011 the actual Gas Consumed = 1.45m kW/hrs/season The Energy Saving against the Old System 92.69%
And 58.01% Saving Against The New System Guarantee 

Project 5.


Project 5 is a system that was installed in the largest single aircraft hangar space in Europe – Hangar 6 is 24,000 sqm where they service multiple 747 and 737 aircraft at one time.

The building operates 90 hours a week. Previously in winter, after door openings to provide aircraft movements in and out of the building, the building would take up to 24 hours to recover building comfort back to +19oC using the warm air system.

In 2008 The HV Warm Air System consumed 26.93.m kW/hrs Gas with Gas and Power costing €676,655.00p for the season.

The SIGMA III GOLD High Efficiency Radiant Heating System provides comfort for aircraft maintenance fitters with a guaranteed recovery in the building after aircraft movements back to +19oC air temperature in 15 mins.

GE Heating Gas Guarantee was 80% = 5.4m kW/hrs/season

In Season 2009 the actual Gas Consumed = 2.42m kW/hrs/season

With the increased Building Comfort and control Energy Savings against the Old System are 91.14%


Saving the Customer Gas & Power €595,955.00p in per season.